Verifying Linearity on a Specific Channel

Verifying Linearity on a Specific Channel

Linearity must be verified on each channel of the power meter to be
tested. After each acquisition, a linearity value is calculated:

reference power meter result – DUT result = linearity value

The channel status (Pass/Fail) will be determined by comparing the
obtained value to the limit linearity (value appearing on the upper right of
the Instrument function tab).

The channel will be tagged as Pass if

otherwise, it will be identified as Fail.

I

MPORTANT

Linearity values obtained when power is under –55 dBm are not
taken into account when determining the channel status, due to
the power meter specifications.