beautypg.com

Metrohm 799 GPT Titrino User Manual

Page 40

background image

2.6 Parameters, key

799 GPT Titrino

36

pause 2 0 s

**titr.




extr.time 0 s

**titr.




dos.element: internal D0




I(pol) 1 µA

U(pol) 400 mV


electrode test: OFF





temperature 25.0 °C
cond.



time interval 2 s
cond.

Waiting time after start volume (0...999 999 s)

Second waiting time, e.g. reaction time after dosing of

a start volume. The waiting time can be aborted with

.

Extraction time (0...999 999 s)

During the extraction time no dosing occurs but the

titration does not stop. The extraction time can be

aborted with .

Selection of dosing element (internal D0, external D1/

D2)

internal D0: internal buret of the Titrino

external D1/2: Buret D1, D2, resp.

Polarization current (-127...127 µA)

or the

polarization potential (-1270...1270 mV, in steps of 10

mV)

is inquired.

Electrode test (OFF, ON)

Test for polarized electrodes. Performed on

changeover from the inactive standby state to a

measurement. "OFF" means that the test is not

performed.

Titration temperature (-170.0...500.0°C).

The temperature is measured at the start of the titration

if a T sensor is connected.

Time interval (1...999 999 s)

Time interval for acquisition of a measured value into

the measuring point list.