HP Hitachi Dynamic Link Manager Software User Manual
Page 328

7. Utility Reference
306
number of LUs and paths.
Table 7-1: Examples of the Starting Time of the Host and the Execution Time of the
Utilities lists examples of the starting time of the host and the execution time of the
HDLM utilities.
Table 7-1: Examples of the Starting Time of the Host and the Execution Time of
the Utilities
#1
The starting time of the host and the execution time of the utilities depend on the
following conditions:
- The hardware configuration (for example, whether you use Fibre Channel
switches)
- The number of hdisk created under the
/dev
directory
#2
Operation
Number of paths
for an LU/ Total
number of paths
#2
Execution time
#1, #3
Execution time of the device configuration on
starting the host
(when HDLM is installed)
4/1024
42 seconds
8/2048
42 seconds
16/4096
43 seconds
Execution time of the device configuration on
starting the host
(when HDLM is not installed)
4/1024
32 seconds
8/2048
38 seconds
16/4096
1 minutes 37 seconds
Executing
cfgmgr
4/1024
53 seconds
8/2048
1 minutes 14 seconds
16/4096
1 minutes 51 seconds
Executing
dlmrmdev
4/1024
1 minutes 15 seconds
8/2048
1 minutes 27 seconds
16/4096
1 minutes 51 seconds
Executing
view -path
4/1024
0.42 seconds
8/2048
1.51 seconds
16/4096
3.41 seconds