beautypg.com

HP Hitachi Dynamic Link Manager Software User Manual

Page 230

background image

4. HDLM Operation

208

12. Go back to the PCI Hot Plug Manager window, select Replace/Remove a PCI

Hot Plug Adapter.
Select the HBA to be replaced.

13. Select Replace in the input field.
14. When the following message is displayed, replace the HBA:

When you finish replacing the HBA, connect the cable and press Enter.

15. Execute the following command to reconfigure the device:


# cfgmgr -l fcs

n

To reconfigure the device, specify the device name of the PCI slot where the HBA

was replaced (

fcs

device); n indicates the instance number of the

fcs

device.

16. If LUN security has been set up for the storage system, delete the WWN of the

previous HBA from the LUN security.

17. Execute the following command to check the path information:


# /usr/DynamicLinkManager/bin/dlnkmgr view -path

For details about the path information, see 6.7 view (Displays Information).

Notes

„

If you replace all HBAs for a volume group without following the above