Securing the cables to the band – ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 98
Sensor Installation and Connection 3-41
Securing the Cables to the Band
Securing the Doppler velocity sensor and pressure depth sensor
cables to the band helps prevent debris from collecting between the
cable and the band or catching on the loose cable. It also prevents
the loose cables from disrupting the flow.
Secure the Doppler velocity and pressure depth sensor cables in the
following way:
1. Starting at the appropriate sensor location, begin securing the
sensor cable with 4-inch x 0.08-inch cable ties through the pre-
drilled holes along the downstream trailing edge of the band up
the side of the band. Run the cable up the left side of the band
(when facing the downstream edge of the band).
Note:
When securing both a pressure depth sensor and a
Doppler velocity sensor cable to the band, place the
velocity cable on top of the pressure cable and secure both
together.
Sensor cabling
2. Continue securing the cables until reaching the ultrasonic depth
sensor or the top of the pipe.
3. Pull the ties until they are taut.
Warning:
Do not over-tighten the cable ties or kink the
sensor cables!
The pressure depth cable sheathes two
components: the electrical cables that operate the sensor
and an air tube that ventilates the sensor. Over-tightening