ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 69

3-12
ADS FlowShark IS Manual
Moving the ring stabilizer into position
9. Perform the following based on the ring type:
Overlapping
Insert the spreader mechanism screw
completely through the hole at the open end of the ring.
Non-Overlapping
Insert a spreader mechanism screw
through the hole at the left end of the ring so that the end
of the screw extends inside the ring.
Ring stabilizer fully connected
10. Place the ring on a flat surface with the spreader mechanism
screw facing up.