Connecting the sensors to the monitor – ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 102
![background image](/manuals/599706/102/background.png)
Sensor Installation and Connection 3-45
Connecting the Sensors to the
Monitor
After installing the ring and sensors and securing the sensor cables
to the pipe and manhole wall, connect the sensor cables to the
appropriate ports on the top of the monitor. The ports are labeled to
identify the appropriate connection for each sensor.
Connect the sensor cables to the monitor ports in the following way:
1. Place the monitor in an upright position to view the monitor
connector ports.
COMM
VELOCITY
ULTRASONIC
ADSENV.COM
PRESSURE
U.S.A.
R
EEx ia IIB T4
Sira 06ATEX2039X
II 1 G
R
0518
MODEL: 5000 - IS1
Use only battery pack 106152
TEST PRESSURE
12 PSI MAX
Cable connector ports
2. Visually inspect each sensor connector and monitor connector
port for damaged or broken pins. Replace a monitor or sensor
with defective ports or connectors.
3. Visually inspect each sensor and monitor connector port for
debris and moisture. Clean off any debris, and dry any surface
moisture. Compressed air is useful for removing moisture from
the inside of the connectors or ports (pin and socket surfaces).
4. Verify that the waterproof seal is present inside each connector
port. The bright orange, rubber seal should sit at the bottom of
the connector port with the pins protruding through the seal.