ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 230

In-2
ADS FlowShark IS Manual
communication, 4-1
direct, 2-2
setting parameters, 6-20
viewing logs, 6-45
wireless, 2-2, 2-5, 4-2
communication cable, 4-4
connecting to EMU, 4-9
installation, 4-4
route, 4-2
communication interface board
specifications, A-6
Communication Interface/Barrier
box, 4-8
compliance
ATEX, 1-12
FCC, 1-9
FCC Part 15, 1-9
GSM/GPRS modem, 1-10
component-level service, 1-7
conduit, 4-6
configuration, 6-2
creating a monitor installation
table, 6-6
creating a monitor location, 6-4
editing the MLI device, 6-19
editing the pressure device, 6-18
editing the ultrasonic device, 6-14
editing the velocity device, 6-15
selecting monitor devices, 6-11
configuring the monitor, 6-2
confined space entry, 3-2, 7-1
confirmation (maintenance), 8-3
connecting to monitor, 4-17
direct, 4-17
via EMU, 4-18
connectors
cleaning and removing moisture,
3-45
monitor, 2-10, 3-45
corbel, 4-6
customer support, 1-7
D
data collection, 6-34
logs, 6-45
data scrubbing, 2-14
DC power, 1-3
requirements, 5-2
Declaration of Conformity, 1-32
depth processing, 2-13
desiccant replacement, 8-13
devices
configuration, 6-11
running diagnostics, 6-26
diagnostics
pressure device, 6-26
ultrasonic device, 6-26
velocity device, 6-26
digital signal processor board, 2-5
specifications, A-3
direct connection to monitor, 4-17
Doppler effect, 2-15
Doppler velocity sensor, 2-15
configuring, 6-15
installation, 3-19
mounting sensor to the ring, 3-19
special installation, 3-35
1/2-band mount, 3-38
3/4-band mount, 3-35
specifications, A-9
downstream pump station, 3-4
dryer tube, 3-46
desiccant replacement, 8-13
end-cap, 3-46, 8-12
replacement, 8-12
securing to monitor, 3-46
E
EC Type Examination Certificate,
1-13
email, ADS Client Services
Department, 1-7