Installing the wireless emu, Emu components – ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 111
![background image](/manuals/599706/111/background.png)
4-8
ADS FlowShark IS Manual
Installing the Wireless EMU
Installing the wireless EMU primarily involves wiring the
communication cable to the Communication Interface/Barrier box
and mounting the EMU in the customer-supplied, non-metallic
protective enclosure at the designated location.
Note:
Because these enclosures vary in design and
construction, ADS does not designate a specific step or
procedure for installing the customer-supplied enclosure in
which to house the EMU. ADS recommends installing the
enclosure at the EMU location based on the manufacturer’s
instructions and at the point in the process that is most
appropriate for the location and application.
EMU Components
The wireless EMU (ADS p/n 3800-0148) used with the FlowShark
IS houses the following major components:
Communication Interface/Barrier PCB (ADS p/n
106124D/106251B)
Modem Reset PCB (ADS p/n 3800-0143)
Quad-Band TCP/IP Wireless Modem (ADS p/n 507959)
Mini-Wing Antenna (ADS p/n 507381)
FlowShark External Battery (ADS p/n 5000-0557)
ADS ships the wireless EMU pre-assembled; however, the battery is
not installed. Perform all EMU installation steps prior to inserting
the battery (or connecting to the external power source, when
applicable) to avoid damage to the Modem reset PCB.
The unit is ready for wireless communication once connected to a
FlowShark IS monitor via a communication cable (ADS p/n
106227), powered by a battery (or external power), and fitted with a
SIM card.