ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 119
4-16
ADS FlowShark IS Manual
4. (applies only when using external power) Run and connect the
external power cable to the power supply, and then connect to
the power source. Refer to Chapter 5, External Power, for
information and instructions on installing the power supply and
connecting to the power source.
5. Contact a remote support analyst (with access to the Internet
and the ADS Profile
®
software). Provide the IP address and
site name, and then have the analyst attempt to communicate
with the flow monitor and perform standard diagnostics or
collect data.
6. Have the analyst verify the signal strength of the antenna is
higher than –85. Valid signal strength can range from -111 to -
51, with -51 representing the best possible signal strength and -
111 representing the lowest/worst possible signal strength. A
signal strength of less than -90 is considered poor and will
result in poor communication and higher battery drain. It also is
likely to have a negative impact on both data collection and
monitor configuration. Have the analyst disconnect from the
monitor.
Note:
The material of which the enclosure housing the
EMU is made may impact the strength of the signal
available. If the material is significantly reducing the signal
strength, consider installing the wireless antenna (currently
mounting inside the EMU) outside the enclosure. If this
requires drilling holes in the EMU and/or the enclosure,
take appropriate measures to seal the holes around the
cable once the antenna is installed to ensure protection for
the internal components against the elements.
7. Backfill the trench between the manhole and the EMU location,
and restore the landscape as necessary.