beautypg.com

ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 119

background image

4-16

ADS FlowShark IS Manual

4. (applies only when using external power) Run and connect the

external power cable to the power supply, and then connect to

the power source. Refer to Chapter 5, External Power, for

information and instructions on installing the power supply and

connecting to the power source.

5. Contact a remote support analyst (with access to the Internet

and the ADS Profile

®

software). Provide the IP address and

site name, and then have the analyst attempt to communicate

with the flow monitor and perform standard diagnostics or

collect data.

6. Have the analyst verify the signal strength of the antenna is

higher than –85. Valid signal strength can range from -111 to -

51, with -51 representing the best possible signal strength and -

111 representing the lowest/worst possible signal strength. A

signal strength of less than -90 is considered poor and will

result in poor communication and higher battery drain. It also is

likely to have a negative impact on both data collection and

monitor configuration. Have the analyst disconnect from the

monitor.

Note:

The material of which the enclosure housing the

EMU is made may impact the strength of the signal

available. If the material is significantly reducing the signal

strength, consider installing the wireless antenna (currently

mounting inside the EMU) outside the enclosure. If this

requires drilling holes in the EMU and/or the enclosure,

take appropriate measures to seal the holes around the

cable once the antenna is installed to ensure protection for

the internal components against the elements.

7. Backfill the trench between the manhole and the EMU location,

and restore the landscape as necessary.