4-6

ADS FlowShark IS Manual

Forming a thin taper using vinyl tape

4. Excavate a trench at least 12 inches (31 cm) deep and 4 inches

(10 cm) wide from the designated EMU location to the monitor

location. Consult local regulations to verify the required trench

depth for the area.

5. Drill a ½-inch (13 mm) (minimum) hole through the corbel

(i.e., the structural foundation holding the manhole cover) or

manhole wall to provide a smooth transition for the cable into

the trench.

6. Run the communication cable from the monitor location in the

manhole to the EMU location. If required by local code, run

the cable through ¾-inch (19-mm) (minimum) electrical PVC

conduit in the following way:

Extend the conduit through the manhole corbel or wall at

the monitor location.

Lay the conduit in the trench per local regulations and feed

the communication cable through the conduit.

Extend the conduit approximately 12 inches (31 cm)

vertically out of the trench (from the ground surface) at the

designated EMU location.