C h a p t e r 7 monitor installation, Monitor installation – ADS Environmental Services FlowShark QR 775003 A2 User Manual
Page 177

7-1
C H A P T E R 7
Monitor Installation
After installing the sensors and establishing communications, install
the ADS
®
FlowShark
®
IS monitor in the manhole. The monitor
mounts inside the manhole by an aluminum mounting bracket
attached to the monitor and bolted to the manhole wall or rim. The
following procedures for monitor installation apply to most sites.
However, because manholes differ in many ways, some sites may
require the installer to implement slight modifications to the
standard installation technique.
Before installing the monitor at the site, activate the monitor to
verify that the monitor is configured correctly for the application
and that the battery pack is operating at an adequate voltage. Make
any necessary changes to the configuration before mounting the
unit. Refer to Chapter 8, Maintenance and Troubleshooting, for
information on replacing the battery pack, when necessary.
Note:
Manhole and sewer system work involves confined
space entry and is inherently dangerous. Therefore,
installers and technicians must comply with all federal,
state, and municipal regulations concerning confined space
entry. ADS is not responsible for any injuries, damages,
claims, or liability resulting directly or indirectly from the
use of this installation guide or the installation of any ADS
equipment.