beautypg.com

Inspecting the monitor, Confirming the monitor – ADS Environmental Services FlowShark QR 775003 A2 User Manual

Page 188

background image

Maintenance and Troubleshooting 8-3

Inspecting the Monitor

Perform the following inspections during site visits or from a

remote location (when applicable):

Inspect the monitor mounting bracket to verify that the bracket

and bolts are free of heavy corrosion and the bolts are tightened

and secure.

Verify that the four bolts holding the monitor together are snug,

and tighten any loose bolts.

Verify that the monitor is mounted securely in the manhole.

Inspect the monitor for general integrity. Verify that nothing

more than surface corrosion is present and that the monitor has

no obvious mechanical defects. Replace the monitor if

necessary.

Perform monitor data confirmations. These should occur from a

remote location when wireless communication is available.

Review the applicable logs in Profile

®

to verify the status of

the monitor clock, communications, firmware, battery pack(s),

and temperatures.

Clean the monitor and sensors regularly with a soft bristle

brush and paper towels. However, do not use detergent!

Make sure all connector ports on the monitor top are dry. Use

compressed air or paper towels to dry out wet or damp

connectors.

Confirming the Monitor

Confirm the accuracy of the sensor subsystems in the monitor on a

regular basis. Confirmation involves comparing manually-measured

depth of flow and velocity readings to the monitor's readings. This

process also verifies sensor parameters. Refer to the Profile User's
Guide

(#950015**) for detailed information on performing

confirmation procedures.