beautypg.com

3 - mounting the kinetix 2000 drive system, Introduction, Installing the 2093 power rail – Rockwell Automation 2093-xxxx Kinetix 2000 Multi-axis Servo Drive User Manual User Manual

Page 37: Chapter 3, Mounting the kinetix 2000 drive system, Introduction installing the 2093 power rail, Chapter

background image

37

Publication 2093-UM001A-EN-P — March 2007

Chapter

3

Mounting the Kinetix 2000 Drive System

Introduction

This chapter provides the system installation procedures for mounting your
Kinetix 2000 drive components to the panel.

The procedures in this chapter assume you have prepared your panel and
understand how to bond your system. For installation instructions regarding
equipment and accessories not included here, refer to the instructions that
came with those products.

Installing the 2093 Power
Rail

The Kinetix 2000 power rail comes in configurations that support one
integrated axis module (IAM), up to seven additional axis modules (AM), and
a shunt module (SM). A slot filler (SF) must occupy any open position.

Topic

Page

Installing the 2093 Power Rail

37

Determining Mounting Order

38

Mount the Modules

40

Mounting the Line Interface Module

41

Segregating Power and Logic Wires

42

WARNING

To avoid hazard of electrical shock, perform all mounting and wiring of
IAM, AM, SM, SF, LIM, or power rail prior to applying power. Once
power is applied, connector terminals may have voltage present even
when not in use.

ATTENTION

Plan the installation of your system so that you can perform all cutting,
drilling, tapping, and welding with the system removed from the
enclosure. Because the system is of the open type construction, be
careful to keep any metal debris from falling into it. Metal debris or
other foreign matter can become lodged in the circuitry, which can
result in damage to components.