beautypg.com

Enable servernet port, Force power off, Power off – HP NonStop G-Series User Manual

Page 149: Prepare to power off, Replace, Storage asic initialization test, Test verify

background image

Enable ServerNet Port

Enables the specified ServerNet router port on this CRU. Perform this action only as directed by OSM alarm repair
actions.

Parameter: Port Number

Force Power Off

Use this action to power off the CRU and all of its subcomponents only if the Prepare to Power Off or Power Off actions
fail. The Force Power Off does not perform the other precautionary checks that are done by the Prepare to Power Off
and Power Off actions. However, these steps are taken:

If the SP on this IOMF CRU is designated as Active (Primary), resets the SP so the peer SP becomes primary
instead

Disables the battery

Power Off

Upon successful completion of the Prepare to Power Off action, you can use the Power Off action to turn off power
to the IOMF CRU and all components.

The Power Off action first checks to ensure that the other IOMF CRU in this enclosure exists and is powered on. If
the check is completed successfully, the CRU is powered off. If the check fails, the CRU remains powered.

The Power Off action does not disable the battery or switch the SP status to Active Secondary. Use the Prepare to
Power Off action to perform these operations before using the Power Off action.

Prepare to Power Off

Performs precautionary check to ensure that it is safe to power off the group and performs steps to prepare the group
for the Power Off action.

The precautionary check ensures that the other IOMF CRU in this enclosure exists and is powered on.

If the check fails, the Prepare to Power Off action fails and the steps that follow are not taken. If the check confirms
that it is safe to power off, these preparatory steps are performed:

If the SP on this IOMF is designated as Active Primary, resets the SP so that the peer SP becomes primary

Disables the battery

Replace

Launches the Replace IOMF guided procedure, which provides step-by-step instructions for replacing the IOMF CRU.

Storage ASIC Initialization Test

Prompts the storage subsystem manager process ($ZZSTO) to initialize the storage ASIC in the CRU. If initialization
fails, an alarm is generated.

This action is triggered automatically when a new CRU is inserted while OSM is running or when an (SCF) STATUS
ADAPTER command is issued. If a CRU is inserted while OSM is not running, perform this action after logging on to
the OSM Service Connection.

Test Verify

Performs basic tests on the CRU. You can perform this action when the CRU is online.

IOMF (I/O Multifunction)

149