Bracket mounting -18, Rosemount 5300 series – Emerson Process Management ROSEMOUNT 5300 User Manual
Page 48
Reference Manual
00809-0100-4530, Rev BA
July 2009
Rosemount 5300 Series
3-18
Bracket Mounting
Mount the bracket to the pole
1. Put the two U-bolts through the
holes of the bracket. Several
holes are available for
vertical/horizontal pipe mounting.
2. Put the clamping brackets on the
U-bolts and around the pipe.
3. Use the supplied nuts to fasten
the bracket to the pipe.
U-bolt
Bracket
Clamping Brackets
M6 screw
Fasten the housing support to the
bracket
Fasten the housing support to the
bracket using the M6 screws. The
screws are threaded through the top of
the mounting bracket and into the
housing support.
Connect the transmitter head on the
probe
Connect the transmitter head on the
probe, making sure that the M50 nut is
properly tightened.
Pipe mounting
(vertical pipe)
Pipe mounting
(horizontal mounting)
Wall
mounting