Cub Cadet I-Beam Style User Manual
Page 120
4-11
4
5.
Remove center bolt from impeller and pull
impeller assembly off crankshaft.
6.
The clevis pins can then be removed by tap-
ping out spring roll pin from first spacer. Be
sure to note direction of the flail edges and
catch spacers and washers as you pull clevis
pins from impeller assembly.
7.
The flails may now be turned around or
replaced.
8.
If for some reason the engine has to be
removed, it can now be removed by taking out
mounting bolts and leaving the rear impeller
housing attached to the engine mounting
base frame.
9.
Reassemble in reverse order.
CHIPPER SHREDDER VACUUM.fm Page 11 Tuesday, February 19, 2002 2:19 PM
See also other documents in the category Cub Cadet Special machinery:
- G1332 (20 pages)
- i1046 (36 pages)
- i1046 (32 pages)
- 54M (28 pages)
- 980 (20 pages)
- 949 (20 pages)
- Time Save (28 pages)
- 990 (24 pages)
- 997 (36 pages)
- V469 (20 pages)
- 4 Fabricated Deck (32 pages)
- 4 Fabricated Deck (32 pages)
- 6 Fabricated Deck (36 pages)
- M48-M60-KW (28 pages)
- 4 Fabricated Deck (36 pages)
- 4 Fabricated Deck (32 pages)
- 6 Fabricated Deck (28 pages)
- 6 Fabricated Deck (32 pages)
- 4 Fabricated Deck (32 pages)
- CC 500 BAT (30 pages)
- CC 22 (20 pages)
- CC 949 (13 pages)
- 33" Wide Area (29 pages)
- Z-Wing (88 pages)
- TANK S Series: Electrical System (9 pages)
- TANK S Series: Hydraulic Drive & Steering System (12 pages)
- TANK S Series: Steering System Adjustments (11 pages)
- 640 (24 pages)
- 640 (20 pages)
- 641 (20 pages)
- 641 (24 pages)
- J466 (32 pages)
- Series C460 (28 pages)
- 435A (24 pages)
- 642 (24 pages)
- 414 (24 pages)
- M465 (28 pages)
- Fun Runner (117 pages)
- 4 x 2 Big Country - Steel Bed (38 pages)
- 4 x 2 Big Country - Poly Bed & Steel Bed (82 pages)
- 4 x 4 Volunteer (328 pages)
- 6 x 4 Big Country (121 pages)
- CC 4BP 32cc (29 pages)
- 2518-48 (60 pages)
- 1527 (36 pages)