2 starting the sample project, Starting the sample project – Lenze PLC Designer V2.x User Manual
Page 38
PLC Designer V2.x| Lenze Application Samples
Commissioning a sample project
Opening a project in the »PLC Designer«
38
L
1.3 EN - 07/2012
7.3.1
Establishing communication with the Industrial PC or EL1xx
In the sample project communication between the devices of the system configuration has
already been established. It is reasonable to check communication before the project is
transferred to a PLC device.
How to check communication:
1. Open the Online menu in the menu bar and select the Communication parameters
menu item there.
2. In the "Communication parameters" dialog window the corresponding parameters
can be edited:
• In the Channels field, the name of the respective channel can be viewed.
Highlight the desired channel to display the associated data in the dialog area
on the right.
7.3.2
Starting the sample project
Transfer the sample project to the PLC device first to then start it.
How to start the sample project:
1. Open the Online menu in the menu bar and select the Log in menu item there.
• Confirm the following query on whether the program is to be saved with Yes.
• The project is transferred to the device.
2. Start the program on the HMI.
• Open the Online menu in the menu bar and select the Start menu item there.
The project will start on the HMI.