Implementation rules – Spectra Precision ProMark 800 Reference Manual User Manual
Page 53

41
Precise Surveying - Field Applications & Concepts
time= Observation time because only one point is surveyed.
Occupation time is irrelevant to Continuous Kinematic.
Raw Data Recording Rate: Interval, expressed in seconds, at
which the field equipment records the raw data received from
the GNSS constellation.
Implementation
Rules
1. Two systems are used: one (the base) is operated on a
chosen point while the other (the rover) is used in the
working area for the survey.
The base may be either a user-owned base, in which case
you need to properly locate your base (see Choosing a
46), or a third-party
operated base.
With a third-party base, base data for your observation
times can be downloaded through the Internet (cf. CORS)
for post-processing. Rover data can also be uploaded to a
centralized processing system (cf. OPUS or AutoGIPSY),
which will in return provide centimeter-accurate position
results.
2. Data must be collected simultaneously by the base and
the rover. It is best to use the same raw data recording rate
on both units.
Chosen Point
Base
Rover
GNSS
GNSS
Rover
Data collected at the base
Data collected on the survey point
Observation Time
Baseline