beautypg.com

6 creating and starting a test case, Introducing the test setup, 6creating and starting a test case – EXFO FTB-8500 Series for FTB-200 User Manual

Page 77

background image

Ethernet and Fibre Channel Application

63

6

Creating and Starting a

Test Case

A test case can be created using one of the following methods:

Test Setup allows the creation of the test case by travelling through the
signal structure. See Introducing the Test Setup on page 63.

See Test Case Availability to determine the test cases supported by the
unit.

Load allows setting up the test case by loading a previously saved
configuration. Open on page 36 for more information.

Introducing the Test Setup

The Test Setup window is displayed by default when the SUI is started. In
the case where the SUI is not in the test setup window, press the Test
Setup
button from the Global Test Status and Controls on page 41.

This manual is related to the following products: