EXFO FTB-8500 Series for FTB-200 User Manual
Page 295

EtherSAM Tabs
Ethernet and Fibre Channel Application
281
Overview (Configuration)
full bandwidth available, then no other service can be enabled. If the
first enabled service uses half bandwidth, then at least another service
can be enabled using up to half bandwidth. Thus, to enable a second
service, first set the CIR value within the non-used bandwidth
(Available), then enable it.
When the Performance Test is disabled, up to 10 services can be
enabled one after the other; the total TX rate is not limited.
Dir.: Direction: Direction is displayed for dual test set test case
providing bidirectional data.
L -> R indicates results from local to remote direction.
R -> L indicates results from remote to local direction.
Global Enable
Configuration Test
The objective of this test is to verify if the network configuration is
correct for each service before starting a long term test (Configuration
Test). In order to test the network configuration, a ramp and/or a burst
test(s) will be generated for each configured service. The
Configuration Test check box is selected by default.
Ramp Test
In the first stage of the test, when CIR check box is enabled, the
throughput will be increased incrementally in steps (see Step List
on page 292) until the CIR level is reached. During the first stage,
the maximum Jitter, Latency, Frame Loss, and throughput are
measured and will be compared to the SLA thresholds to declare a
pass/fail verdict.
In the second stage of the test, when the CIR+EIR check box is
enabled, the throughput will be increased to the CIR+EIR level to
compare against expected maximum throughput threshold to
declare a pass/fail verdict.