3 requirements, 1 system requirements, 2 establishing communication with the controller – Lenze PLC Designer ApplicationTemplate (PLC Designer R3-x) User Manual
Page 13: Requirements, System requirements, Establishing communication with the controller, 3requirements
Lenze · ApplicationTemplate · 1.3 EN - 04/2013
13
Requirements
System requirements
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3
Requirements
3.1
System requirements
3.2
Establishing communication with the controller
• Connect the Engineering PC with the controller via a network cable. The »PLC Designer«
accesses the controller via Ethernet.
• Make the IP settings with the »PLC Designer«.
How to check the communication settings:
1. Double-click the desired controller in the Devices view.
2. Make the desired settings on the Communication settings tab.
• Click the Add gateway button to insert a gateway.
Engineering PC
Controller
Hardware
PC/notebook
PLC (Logic) from firmware V3.3
Operating system
Windows XP
Windows CE
Required Lenze software
»PLC Designer« from V3.3
• Contains the
ApplicationTemplate
• Contains the Lenze library
"L_EATP_ApplicationTemplate.co
mpiled-library"
Runtime software
• Logic
• Motion (this requires updating the
project information: "Update
devices")
Further requirements
-
Depending on the application case:
• CAN or EtherCAT bus system
• CAN or EtherCAT node