4 demand value measurement – KYORITSU 6300 Instruction Manual User Manual
Page 145

MODEL6300
13. 6
MODEL6300
Section 13 Specification
Section
13
13-4 Demand value measurement
(1) Target value (T
DEM
)
Display range
0.1W ~ 999.9GW (set value is fixed)
(2) Predicted value (G
DEM
)
Display range
0 ~ 999999dgt
* Decimal position, unit is same to T
DEM
.
Equation
erval
int
demand
of
beginning
from
Period
erval
int
Demand
DEM
Ȉ
G
DEM
×
=
(3) Demand value (present value) (
ȈDEM)
Display range
0 ~ 999999dgt
* Decimal position, unit is same to T
DEM
.
Equation
(
)
erval
int
Demand
hour
1
erval
int
demand
of
beginning
from
WP
DEM
Ȉ
×
+
=
¦
6
6
DEMi
DEM
*
1
i
: 1P2W(1ch)
*
2
,
1
i
: 1P2W(2ch), 1P3W, 3P3W
*
3
,
2
,
1
i
: 1P2W(3ch), 3P4W
(4) Load factor
Display range
0.00 ~ 9999.99%
Equation
DEM
T
DEM
6
(5) Setting item
Record interval
(Demand interval)
1/ 2/ 5/ 10/ 15/ 20/ 30sec. 1/ 2/ 5/ 10/ 15/ 20/ 30min. 1 hour
Start/ Stop
By manual operation or specifying start/ stop date and time
Demand
target value
0.1W ~ 999.9GW
Inspection cycle
Can select one of three preceding time to the set record
interval.
(e.g. When interval is 30min., select one from 10/ 15/ 20min.
when interval is 5min., select one from 30sec/ 1/ 2min.
* In case that the record interval is set to one of 1/ 2/ 5sec.,
setting for inspection cycle is not available.
* When G
DEM
>
T
DEM
is detected at each inspection cycle
,
buzzer sounds and backlight blinks.