Model6300 – KYORITSU 6300 Instruction Manual User Manual
Page 106

MODEL6300
8. 8
MODEL6300
Section 8 Demand value measurement
Section
8
‣ ‧ • ⁈ ‥ • • ⁈ • • ⁈
‣ ⁂․ ⁉ ‣ ⁂‥ ⁉ ‥ ⁂ ‥ ⁉ ‥ ⁂… ⁉
‧ ″
‣ • ″
․ • ″
‧ • ″
‣ • • ″ ․ • • ″ ‧ • • ″ ‣ • • • ″
‣ ‧ • ⁈ ‥ • • ⁈ • • ⁈
‣ ⁂․ ⁉ ‣ ⁂‥ ⁉ ‥ ⁂‥ ⁉ ‥ ⁂… ⁉
‧ ″
‣ • ″
․ • ″
‧ • ″
‣ • • ″ ․ • • ″ ‧ • • ″ ‣ • • • ″
Ɣ Displayed items
It is set at “Setting 16”. Set the desired value.
This is the Predicted demand Value (see definitions). It is displayed on the
LCD screen at the start of a survey. At the end of an interval the Predicted
and Present demand value are the same. I did not understand this part!
This is the Present Demand Value(see definitions)
This is the count down, in 1 sec. decrements to the end of the interval.
This is the load factor(See definitions)
These are the time and when the max. demand recorded so far from the start
of the survey was measured.
The max. demand value measured between the beginning and the end of
measurement is displayed.