beautypg.com

KROHNE Summit 8800 Vol 2 User Manual

Page 39

background image

39

www.krohne.com

08/2013 - MA SUMMIT 8800 Vol2 R02 en

SUMMIT 8800

METERING PRINCIPLES

03

Proving description
A01

Start proving

The proving request tag has been issued via display or Modbus - this

initiates the prove request
Tips: With the proving status tag, the result of the last prove can be

monitored

• N/A

• OK

• Manually aborted

• Maximum runs reached

• Not enough runs remain

• Volume stability

• Pressure stability

• Temperature stability

• Valve setup error

• Valve return error

• Communications error

• Run error

• Volume deviation

• Pressure deviation

• Temperature deviation

• Density deviation

• Pressure alarm

• Temperature alarm

• Density alarm

• Frequency input

• Validation rejected

• Data update failed

• Valve error

• Turbine error

• Setpoint error

• USM error

With the proving position tag the status of the prove can be monitored

Idle

• Beginning prove

• Initialising report

• Initialising communications

• Configuring valves

• Stabilising flow

• Running

• Resetting valves

• Ending communications

• Waiting for validation

• Generating report

The ball position tag does not indicate the actual ball position, but is a

status indicator for the Proving run for ball provers.

Instead of ball position monitor the status of the valve

A02

Send begin prove

command to required

run

The proving.1 tag of the required stream is set.
The prover general alarm tag is set.

These tags are displayed on the alarm page.

A03

Correct frequency?

Prover frequency tag is checked if pulses are being received, thus

frequency cannot equal zero.
Confirm that the pulse bus is configured correctly.

Refer to section ‘prover I/O selection’ for configuration details.