Extron Electronics DVS 510 Series User Guide User Manual
Page 90

DVS 510 Series • Remote Configuration and Control
84
8.
Click Begin. The following indicators on the Firmware Loader window show the
progress of the update:
•
The
Transfer
Time
field shows the amounts of remaining and elapsed time for the
update.
•
The
Total
Progress
field displays a status bar with
Uploading...
above it.
•
In the
Devices
section, the
Progress
column displays an incrementing percentage
and the
Status
column displays
Uploading
.
Figure 38.
Firmware Upload in Progress
When the upload is complete, the
Remaining
Time
field shows
00.00.00
, the
Progress
column shows
100%
, and
Completed
is displayed above the progress bar and
in the
Status
field.
At this point, the DVS resets itself. The LCD screen on the unit displays
Restarting
Please
Wait...
, then
Initializing
Please
Wait...
. When the reset is complete,
all the buttons on the front panel flash red, then green, then amber; and the LCD screen
returns to the default cycle.
9.
When the firmware upload and unit reset are complete, close the Firmware Loader
window. The SPPCP window is redisplayed.