Call scheduling, Introduction to call scheduling, Chapter 38 call scheduling – ZyXEL Communications ZyXEL ZyAIR 100 User Manual
Page 485: 1 introduction to call scheduling

ZyWALL 10~100 Series Internet Security Gateway
Call Scheduling
38-1
Chapter 38
Call Scheduling
Call scheduling allows you to dictate when a remote node should be called and for how long.
38.1 Introduction to Call Scheduling
The call scheduling feature allows the ZyWALL to manage a remote node and dictate when a remote node
should be called and for how long. This feature is similar to the scheduler in a videocassette recorder (you
can specify a time period for the VCR to record). You can apply up to 4 schedule sets in Menu 11.1 -
Remote Node Profile. From the main menu, enter 26 to access Menu 26 - Schedule Setup as shown next.
Figure 38-1 Schedule Setup
Lower numbered sets take precedence over higher numbered sets thereby avoiding scheduling conflicts. For
example, if sets 1, 2, 3 and 4 are applied in the remote node, then set 1 will take precedence over set 2, 3 and
4 as the ZyWALL, by default, applies the lowest numbered set first. Set 2 will take precedence over set 3 and
4, and so on.
You can design up to 12 schedule sets but you can only apply up to four schedule sets for a remote node.
To delete a schedule set, enter the set number and press [SPACE BAR] and then
[ENTER] or [DEL] in the Edit Name field.
Menu 26 - Schedule Setup
Schedule
Set #
------
1
2
3
4
5
6
Name
------------------
______________
______________
______________
______________
______________
______________
Schedule
Set #
------
7
8
9
10
11
12
Name
------------------
______________
______________
______________
______________
______________
______________
Enter Schedule Set Number to Configure=
Edit Name=
Press ENTER to Confirm or ESC to Cancel: