beautypg.com

Align receiver, 7commissioning, 2 initial commissioning – Pilz PSENvip RL D P User Manual

Page 93

background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

7-9

7.2

Initial commissioning

7

Commissioning

7.2.1.6

Align receiver

Align receiver

7-

Inbetriebnahme_Erstinbetriebnahme_Empfaenger_ausrichten_1

Attach an adjustment template with magnets to the upper tool. The tip
of the upper tool must sit in the notch on the stop of the adjustment
template.

Align the alignment grid of the adjustment template to the contour of
the upper tool.

Fig. 7-6:

Attach the adjustment template to the receiver

Press the key.

Using the keys , select the Adjustment option.

Press the key to open the Adjustment option.

Inbetriebnahme_Winkelmessung_Hinweis

Inbetriebnahme_Erstinbetriebnahme_Empfaenger_ausrichten_Justagebild_1

INFORMATION
The tool must be aligned to the central bending line if bending
angle measurement is to be used.

Align the

alignment grid

on the upper

tool

Centre point of

the upper tool

in the notch on

the back stop