Overrun measurement, 10 system connections, 3 pnozmulti – Pilz PSENvip RL D P User Manual
Page 147

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
10-17
10.3
PNOZmulti
10
System Connections
10.3.4
Overrun measurement
Overrun measurement
10-
Systemanbindung_PNOZmulti_NLW
The user program evaluates the result of the overrun measurement
(overrun measurement outputs 1 and 2 on the PSENvip).
Source connection points
PSENvip_Enable: Enable foot PSENvip
TDC: Top dead centre
Footpedal_Enable: Enable foot switch
Source connection point
Overrun_Fault: Error on the overrun measurement
This manual is related to the following products: