Kinze Ag Leader Integra User Manual
Page 318
![background image](/manuals/564399/318/background.png)
302
Firmware Version 5.2
Press: Map button > Strip Till Control button > Static Calibration button
1. Read Static Calibration warning
A warning appears, advising to disable the blower fan circuit and prepare to catch any product dispensed
in an appropriate container. Press
to continue.
2. Select Metering Circuit to Calibrate
The CFR Calibration Wizard appears. Use the drop-down menu to choose the desired channel to calibrate.
Press
to continue.
3. Enter Dispense Amount
Press
to enter the amount of product to be dispensed into the container. Press
to accept
value. Press
to continue.
4. Enter Simulated Target Rate
Press
to enter a simulated target rate, shown in pounds per acres. Press
to accept value.
Press
to continue.
5. Start Target Rate Countdown
Press the start button to begin metering product. The
metering circuit will stop automatically when the system
perceives the simulated target rate has been dispersed.
As the countdown is started, the button will turn red and
state Stop. When the countdown is complete, press
to continue.
6. Enter Actual Dispense Amount
Enter the actual dispense amount, in pounds.
Press
to continue.
Note: The CFR will be calculated from the actual product amount dispensed.
7. Calibration Complete
A message appears, stating that your calibration is complete, and showing the CFR amount, in cubic feet
per revolution. Either:
- Press
to exit the calibration without saving the value.
- Press Repeat Calibration to begin the process again.
- Press
to save the value and exit the calibration routine.
3500
1
RPM
2
3
20
15
15
Static
Calibration
CFR Calibration Wizard: Step 4 of 6
Reset
lb
START