14.4. Connecting the process controller Type 8793

First connect the process controller as described in chapter “14.2. Connection of the positioner Type 8792”.

14.4.1. X5 - M8, 4-pole circular connector,

plug assignments of the process actual value input

Input.type* Pin

Wire.
colour**

Configuration

DIP.
switches

On.the.
device.side

External.circuit

4 – 20 mA-
internally
supplied

1

brown

+24 V transmitter supply

Switch
on left

1
2

3
4

Transmitter

GND

2

white

Output from transmitter

3

blue

GND (identical with GND
operating voltage)

4

black

Bridge to GND (Pin 3)

4 – 20 mA-
externally
supplied

1

brown

not used

Switch
on right

2

white

Process actual +

2

4 - 20 mA

3

blue

not used

4

black

Process actual –

4

GND 4 - 20 mA

Frequency-
internally
supplied

1

brown

+24 V sensor supply

Switch
on left

1

+24 V

2

white

Clock input +

2

Clock +

3

blue

Clock input – (GND)

3

Clock – / GND
(identical with GND
operating voltage)

4

black

not used

Frequency-
externally
supplied

1

brown

not used

Switch
on right

2

white

Clock input +

2

Clock +

3

blue

Clock input –

3

Clock –

4

black

not used

Pt 100
(see infor-
mation
below)

1

brown

not used

Switch
on right

2

3
4

Pt 100

2

white

Process actual 1 (power supply)

3

blue

Process actual 3 (GND)

4

black

Process actual 2 (compensation)

*

Can be adjusted via software (see chapter “21. Start-up sequence”).

**

The indicated colors refer to the connection cable available as an accessory (918718).

Table 15:

Pin assignment; X5 - M8, 4-pole circular connector - process actual value input

Connect the Pt 100 sensor via 3 cables for cable compensation reasons. It is essential to bridge Pin 3
and Pin 4 on the sensor.

When the operating voltage is applied, the process controller is operating.

Now make the required basic settings and actuate the automatic adjustment of the process controller. The
procedure is described in chapter “21. Start-up sequence”.