Verifying a successful configuration, Connecting the mg 1000b core to the network, Procedure 20 verifying successful configuration – Nortel Networks NN43001-314 User Manual
Page 244: Procedure 20, Verifying successful configuration
![background image](/manuals/194032/244/background.png)
244
MG 1000B software installation
—End—
After installing software and configuring basic information about the
Signaling Server, the Signaling Server components can be configured using
the web-based Element Manager interface. See Element Manager System
Reference - Administration (NN43001-632).
Verifying a successful configuration
To ensure that ELAN and TLAN network interfaces on the Signaling Server
are configured correctly, perform a ping test at each interface.
Procedure 20
Verifying successful configuration
Step
Action
1
From the Call Server, in LD 117, enter:
ping
2
From the Media Card, log in to the Media Card and enter:
ping "ip address",3
3
From the Signaling Server, log in and enter:
ping "ip address",3
—End—
Connecting the MG 1000B Core to the network
Connecting the MG 1000B Core to the network
The MG 1000B Core has two 10/100BaseT ports (1 and 2) and one
Attachment Unit Interface (AUI) port at the back on the lower left-hand side.
See
Figure 88 "Back of MG 1000B Core" (page 245)
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314
01.02
Standard
Release 5.0
20 June 2007
Copyright © 2007, Nortel Networks
.