Figure 81 rack-mounting the signaling server, Warning – Nortel Networks NN43001-314 User Manual
Page 234
![background image](/manuals/194032/234/background.png)
234
MG 1000B platform hardware installation
a. Align the rack-mount brackets on the Signaling Server with the
slide rail system on the rack posts.
b. Slide the Signaling Server into place.
Refer to
Figure 81 "Rack-mounting the Signaling Server" (page 234)
Figure 81
Rack-mounting the Signaling Server
3
Tighten the screws through the faceplate of the Signaling Server to
the rack-mount bracket.
WARNING
Do not apply excessive torque while tightening the bolts.
The bezel door is plastic and does not require or withstand
overtightening.
—End—
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314
01.02
Standard
Release 5.0
20 June 2007
Copyright © 2007, Nortel Networks
.