beautypg.com

IBM INFO PRINT 3000 User Manual

Page 247

background image

13.

Install the oil pan onto the lower oiler-belt support shaft.

14.

Raise the hot roll shield.

15.

Close the oiler-belt gate.

16.

Turn the wing nut clockwise to latch the gate. Ensure that the gate is firmly

latched.

17.

Close the stacker end cover.

18.

The message may change to WARMING UP or PLEASE STAND BY.

19.

To resume processing, SELECT the Ready pushbutton on the main Display

Touch Screen.

HC6OG073

1

Chapter 7. Ordering and Replacing Supplies

215