Verilink Access Manager 2000 (896-502037-001) Product Manual User Manual
Page 324

Monitoring and Troubleshooting Access Manager
8-54
Access Manager 2000 User Manual
from 1 to 2 in each ConnecT1 Plus node. For this test, this CSU is
the near-end CSU.
3. Enter the plug-in slot number (i.e., the number of the circuit
element) of the NCC or TAC. This number depends on the shelf
number selected above and is within the range below. Press
to
accept the shelf and slot (plug) numbers.
•
Multiline Shelves: 1 to 13
•
Dual-line Shelves: 1 to 2
The Select CSU Test Activity screen appears.
4. Select the desired option.
•
To send a test signal, select an option from
A
through
D
and
continue. Each of these test signals (options) are described in the
following paragraphs.
•
The NCC or TAC reports the error count to Access Manager
during the test. You can view the results of the test while it is in
progress or after the test is completed. To view results at any
time, continue with Step 11.
•
To abort a test, continue with Step 7.
Options
A
through
D
in the Select CSU Test Activity menu
correspond to test signals that the NCC or TAC may apply to a DS1
circuit: You can send each test signal toward either the equipment
side or the network side of the NCC or TAC.
F5