2 installing the front panel board, Installing the front panel board – Kontron TIGH2U Carrier Grade Server User Manual
Page 92

TIGH2U Server—Server Component Replacements
Kontron Carrier Grade Server TIGH2U
Product Guide, rev.1.2
December 2009
92
5.4.2
Installing the Front Panel Board
1. Lower the replacement front panel board into the chassis. (
, “A”)
2. While holding the rear edge of the board, push the board forward, sliding the serial port connector
through the matching cutouts in the front panel of the chassis.
3. Lower the rear of the board into position, fitting the board over the placement peg. (“B”)
4. Push the board forward, locking the board onto the placement peg. (“C”)
5. Screw the board into place. (“D”)
6. Screw in the TAM board standoff. (“E”)
Figure 72.
Installing the Front Panel Board
TS000437
D
A
E
C
B
7. (Optional) Install the hardware RAID components, see
Section 4.4, “Installing Remote
Management Module 2 Components” on page 61
components that you removed from the old front
panel board:
8. (Optional) Install the SMART eUSB SSD, see
Section 4.5, “Installing an Embedded USB Solid-
.
9. Install the TAM board. For instructions, see
Section 5.3.3, “Installing the TAM Board” on page 88
10. Install the PCI fan assembly. For instructions, see
Section 5.2.6, “Installing the Fan Assembly” on
.
11. Install the CPU fan assembly. For instructions, see
Section 5.2.3, “Installing the CPU Fan
12. Connect the power cables.
13. Install the bridge board.
14. Connect the Intel
®
RAID Smart Battery. For instructions, see
Section 4.6.2, “Installing the RAID
15. If this is the last task you are performing, replace the front bezel and the chassis top cover.
Reconnect the external devices and plug in the power cord(s).