beautypg.com

Rgu installation verifications, Rgu installation verifications -11 – Rockwell Automation 2364F Regenerative DC Bus Supply Unit (RGU) User Manual

Page 81

background image

Publication 2364F-5.01– October 2003

Installing Your RGU

7-11

RGU Installation Verifications

1. Using an ohmmeter or other continuity testing device, verify that

shorts do not exist between:

2. Verify the AC input connections.

3. If a door-mounted HIM module or SCANport connection has not

been selected, connect a HIM or GPT to the RGU’s control board
at this time.

!

ATTENTION: The verifications described in this
section must be done before turning power on to the
system. Failure to do so may result in personal injury
and/or equipment damage.

ATTENTION: Do not turn on the power if the RGU
fails any of the verifications described in this section.
Doing so may result in personal injury and/or equipment
damage.

ATTENTION: You must correct all problems before
proceeding to the next step. Failure to do so may result
in personal injury and/or equipment damage.

Source 1

Source 2

Check Below if No Short

L1

L2

L1

L3

L2

L3

L1

PE

L2

PE

L3

PE

R (EA1)

PE

S (EA1)

PE

T (EA1)

PE

DC+ Bus

DC- Bus

DC+ Bus

PE

DC- Bus

PE

DC+ Bus

TE

DC- Bus

TE

PE

TE