Nortel Networks 9150 User Manual
Page 445

Remote Gateway 9150 Installation and Administration Guide
415
January 2005 Display
log
definitions
Statistic
Definition
LOG NUMBER
5
DESCRIPTION
This log indicates that the QoS of the IP network degraded and the
system transitioned to the PSTN.
SEVERITY
NORMAL
TASK
QoS Transitioning
PRODUCT
RLC, 9150, 911x
CANCELLATION
Log number 2 - FB_RECOVERY_LOG_ID
ACTION TO BE TAKEN
Investigate why the IP network was determined to be below VoIP
quality. Review the Engineering Guidelines.
PARAMETERS
1) Unit ID of the Remote Gateway 9100 Series unit for which the IP
QoS has degraded
DISPLAYED TEXT
Transition to Remote Site: P1
PRODUCES HOST PBX
ALARM AND ALERT
Yes
LOG NUMBER
6
DESCRIPTION
This log indicates that the QoS of the IP network recovered and the
system transitioned to the IP Network.
SEVERITY
NORMAL
TASK
Fallback
PRODUCT
RLC, 9150, 911x
CANCELLATION
Log number 1 - FB_FALLBACK_LOG_ID
ACTION TO BE TAKEN
Investigate why the IP network was determined to be below VoIP
quality. Review the Engineering Guidelines.
PARAMETERS
1) Unit ID of the Remote Gateway 9100 Series unit for which the IP
QOS has recovered
DISPLAYED TEXT
Recovery to Remote Site: P1
PRODUCES HOST PBX
ALARM AND ALERT
Yes