beautypg.com

Nortel Networks 9150 User Manual

Page 132

background image

102

Remote Gateway 9150 Installation and Administration Guide

Installing the Remote Gateway 9150 unit

Standard 3.1

2

Use the pre-drilled screw slots on the bottom of the Remote Gateway 9150
unit as a guide to measure and mark the location on the wall for each
mounting screw.

The measurements between the screw slots are as follows:

!

from front to back panels: 15 cm (6 in.)

!

from side to side: 37.5 cm (15 in.)

Note: Two sets of screw slots are provided. Each set allows you to route
the cables to the left or right when the Remote Gateway 9150 unit is
correctly mounted. Ensure you use the same screw slot orientation for each
location that you mark on the wall.

3

Mount the screws.

Note: Do not screw the screws all the way in. Screw the heads to about
5 mm (1/8 in.) from the wall.

4

Mount the Remote Gateway 9150 unit on the screws, and then gently pull it
down so the screws slide into the narrow portion of the screw slots.

Do not let go yet!

5

Ensure the Remote Gateway 9150 unit is securely mounted.

6

When you are satisfied that the Remote Gateway 9150 unit is securely
mounted, continue with “Connecting the Remote Gateway 9150 unit” on
page 105.

.

WARNING

Risk of personal injury or equipment damage

Ensure the Remote Gateway 9150 unit is securely fastened to
the wall. Otherwise, it can fall, be damaged, and cause injury
to yourself or others.