9 periodic actions, 1 mounting and disassembly work, 1 disassembling and mounting the panels – SMA SC 500CP XT User Manual
Page 79: Periodic actions, Mounting and disassembly work, Disassembling and mounting the panels, 9periodic actions

9
Periodic Actions
9.1
Mounting and Disassembly Work
9.1.1
Disassembling and Mounting the Panels
Danger to life due to electric shock or electric arc if live components are touched
• Switch off the inverter and wait at least 15 minutes before opening it to allow the capacitors to discharge
completely.
• Disconnect the inverter (see Section 5, page 51).
Property damage due to rupture of grounding conductors
The components are connected to the inverter via the grounding conductor. If the roof is not disassembled correctly,
the grounding conductors may be pulled out.
• Take care not to damage the grounding conductors during disassembly.
Disassembling the panels
1. Remove the screws of the front panels using a Torx screwdriver.
2. Detach the grounding straps from the panels.
3. Remove the panels.
Mounting the panels
Requirement:
☐ The protective covers in the connection area must be mounted (see Section 9.1.2, page 80).
Procedure:
1. Attach the grounding straps to the panels of the interface cabinet (torque: 8 Nm to 10 Nm).
2. Ensure that the grounding straps are firmly in place.
3. Attach the panels using a Torx screwdriver (torque: 2 Nm to 3 Nm).
9 Periodic Actions
SMA Solar Technology AG
User Manual
79
SCCPXT-BA-E4-en-54
- SC 630CP XT SC 720CP XT SC 760CP XT SC 800CP XT SC 850CP XT SC 900CP XT SC 500CP XT Maintenance Manual SC 630CP XT Maintenance Manual SC 720CP XT Maintenance Manual SC 760CP XT Maintenance Manual SC 800CP XT Maintenance Manual SC 850CP XT Maintenance Manual SC 900CP XT Maintenance Manual SC 1000CP XT SC 1000CP XT Maintenance Manual