beautypg.com

9 bore milling (cycle 208), Cycle run, Bore milling (cycle 208) – HEIDENHAIN TNC 640 (34059x-05) Cycle programming User Manual

Page 94

background image

Fixed Cycles: Drilling

3.9

BORE MILLING (Cycle 208)

3

94

TNC 640 | User's Manual Cycle Programming | 1/2015

3.9

BORE MILLING (Cycle 208)

Cycle run

1 The TNC positions the tool in the tool axis at rapid traverse

FMAX to the programmed set-up clearance above the workpiece
surface and then moves the tool to the bore hole circumference
on a rounded arc (if enough space is available).

2 The tool mills in a helix from the current position to the first

plunging depth at the programmed feed rate

F.

3 When the drilling depth is reached, the TNC once again

traverses a full circle to remove the material remaining after the
initial plunge.

4 The TNC then positions the tool at the center of the hole again.

5 Finally the TNC returns to the setup clearance at

FMAX. If

programmed, the tool moves to the 2nd set-up clearance at
FMAX.