beautypg.com

7 floor finishing (cycle 23, din/iso: g123), Cycle run, Floor finishing (cycle 23, din/iso: g123) – HEIDENHAIN TNC 640 (34059x-05) Cycle programming User Manual

Page 203

background image

FLOOR FINISHING (Cycle 23, DIN/ISO: G123)

7.7

7

TNC 640 | User's Manual Cycle Programming | 1/2015

203

7.7

FLOOR FINISHING (Cycle 23,
DIN/ISO: G123)

Cycle run

With Cycle 23 FLOOR FINISHING, you can clear the finishing
allowance for floor that is programmed in Cycle 20. The tool
approaches the machining plane smoothly (on a vertically tangential
arc) if there is sufficient room. If there is not enough room, the TNC
moves the tool to depth vertically. The tool then clears the finishing
allowance remaining from rough-out.

Before calling Cycle 23 you need to program further cycles:

Cycle 14 CONTOUR GEOMETRY or SEL CONTOUR

Cycle 20 CONTOUR DATA

Cycle 21 PILOT DRILLING, if necessary

Cycle 22 ROUGHING, if necessary

Cycle run

1 The TNC positions the tool to the clearance height at rapid

traverse FMAX.

2 The tool then moves in the tool axis at the feed rate Q11.

3 The tool approaches the machining plane smoothly (on a

vertically tangential arc) if there is sufficient room. If there is not
enough room, the TNC moves the tool to depth vertically.

4 The tool clears the finishing allowance remaining from rough-

out.

5 Finally, the tool retracts in the tool axis to the clearance

height or to the position last programmed before the cycle.
This depends on the parameter ConfigDatum, CfgGeoCycle,
posAfterContPocket.