beautypg.com

Loadable pump timeouts – Gasboy 1000 Series Technical Reference Manual User Manual

Page 39

background image

Card Systems

03/07/03

2-21

quantity. An inventory reorder point can be loaded into the system for each tank.
The reorder point is printed as a reminder when the current tank totalizers are
printed. Once the tank goes below the reorder level, REORDER FUEL prints in
the ERROR field of all transactions withdrawing from that tank until the inventory
is adjusted above the reorder level. Complete pump, tank, and product
assignments may be printed using the TI command (Figure 2-11). The tank
totalizers have seven digits to the left of the decimal point and three digits to the
right (xxxxxxx.xxx)

VEÂ

V7PGÂÆ!ÂÂEPXAPVQTa0ÂÂÂ)# !!) ÂTAQT@ATÂ" Â

V7PGÂÆ"ÂÂEPXAPVQTa0ÂÂ!" ÂTAQT@ATÂ# Â

V7PGÂÆ#ÂÂEPXAPVQTa0ÂÂ! ÂTAQT@ATÂ# Â

Â

Figure 2-11. Tank Inventory


Loadable Pump Timeouts

Description

The Series 1000 monitors two timeout periods. Timeout values are assigned to
ensure that the pumps are not activated and left unattended.


There are two timeout periods:

Interval in which the pump is activated by the system and the first pulse is
received.

Interval between turning off the nozzle (last pulse received) and turning off
the pump handle. This timeout is reset if additional pulses are received.

This timeout is reset each time a pulse is received and is terminated by shutting
off the pump handle. Timeout periods range from 1 to 180 seconds and can be
set individually for each pump. A typical timeout is 80 seconds. If either timeout
period is exceeded during a transaction, the transaction ends automatically, and a
TIMED OUT message appears in the transaction ERROR field. Figure 2-12
shows the pump timeout and pulse rate assignments listing initiated by the XP
command.

`RÂ

ÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂRWIRÂVEIAQWVUÂÂ

ÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂEPÂUA9QP@UÂ

Â

ÂÂÂ

ÂRWHUAUÂRATÂÂ8ABQTAÂÂ7BVATÂÂ

RÆÂ

ÂÂÂÂC7HHQPÂÂÂRWHUAUÂÂRWHUAUÂ

ÂÂÂÂÂÂÂÂÇÂÂÂÂÂÂ & ÂÂÂÂ & ÂÂÂ

ÂÂÂÂÂÂ ! ÂÂÂÂÂ ( ÂÂÂÂ ( ÂÂÂ

ÂÂÂÂÂÂ ! ÂÂÂÂÂ ( ÂÂÂÂ ( ÂÂÂ

ÂÂÂÂÂÂ ! ÂÂÂÂÂ ( ÂÂÂÂ ( ÂÂÂ

Â

Figure 2-12. Pump Timeout and Pulse Rate Assignments