Rockwell Automation 7000L PowerFlex Medium Voltage AC Drive (C Frame) - Classic Control User Manual
Page 214
Commissioning 4-9
7000 “C” Frame
7000L-UM300I-EN-P – Juen 2013
Technical Publications
Each drive is shipped with a service binder containing all technical
publications required to commission and troubleshoot the drive line-
up. This section describes how to determine what technical
publications are required and how to obtain them in the event that the
service binder is not available at the time of commissioning or
additional information is required.
PowerFlex “C” Frame Manual
The PowerFlex “C” Frame drive manual will be required during
drive commissioning to guide you through each commissioning
procedure. Copies of the manual or new revisions of the manual can
be requested from your local Rockwell Automation Office.
PowerFlex “C” Frame Parameters
The PowerFlex 7000 Technical Data publication for Parameters is
also required for Commissioning and Troubleshooting. Refer to
7000-TD001_-EN-P for the latest firmware revision.
Additional Manuals
Any additional manual required to configure the drive line-up can be
identified on the Electrical Schematics. The Schematic titled
“General Notes” identifies all required Rockwell Automation
Publications by publication number.
Resources Required to Complete
Prior to attempting to commission the drive ensure you have the
Drive Commissioning
following:
• Self powered gate driver board power supply cable (supplied
with SCR rectifier drives only)
• Rockwell Automation electrical and mechanical diagrams
• PLC program (if supplied with a PLC)
• Commissioning data sheets
• All required manuals
If any of the above information is not available prior to the time of
commissioning, please contact the factory.