beautypg.com

Commissioning preparation – Rockwell Automation 7000L PowerFlex Medium Voltage AC Drive (C Frame) - Classic Control User Manual

Page 213

background image

4-8

Commissioning

7000L-UM300I-EN-P – June 2013

7000 “C” Frame

Commissioning Preparation

The following section identifies all the tools and resources required
to successfully commission a PowerFlex “C” Frame drive line-up. In
addition, it identifies how to obtain the required equipment in the
event that it is not readily available prior to commissioning the drive.
It is recommended that all items listed below be obtained prior to
attempting to commission the drive. Ensure that the contents of this
section are reviewed and that the use of the equipment described
within are understood prior to commencing commissioning of the
drive. If further support or additional information is required, contact
your local Rockwell Automation service office or Medium Voltage
Support at (519) 740-4790.

Recommended Tools and Equipment

Hand Tools

• Metric and Imperial wrenches, sockets, and Hex keys

• Torque wrench

• Assortment of screw drivers

• Assortment of electrical tools (wire strippers, electrical tape,

crimpers, etc.)


Electrical Equipment

• High voltage gloves – 10 kV insulation rating (minimum)

• Approved high voltage potential tester – 10 kV rating (minimum)

• Anti-static strap

Test Equipment

• 100 MHz oscilloscope with at least 2 channels and memory

• 600-Volt (1000V rating) digital multimeter with assorted clip leads

• 5000 Volt megohmmeter

Computer Requirements and Software

• Laptop computer (486 or higher installed with Microsoft (MS)

Windows)

• Microsoft HyperTerminal (Provided with MS Windows)

• Rockwell Automation Software (RS) drive tools (Optional)

• RS Logix **

• Required computer cables

– 9-Pin Null Modem (See Chapter 7 on Troubleshooting)
– 9-Pin Serial (See Chapter 7 on Troubleshooting)
– Remote I/O (SCANport DeviceNet…) *
– PLC Communications Cable **

* Only required when Remote I/O has been provided with the drive.
** Only required when PLC has been provided with the drive