Festo Контроллер позиционирования CPX-CMPX User Manual
Page 58
2. Assembly
2−14
Festo P.BE−CPX−SYS−EN en 0902e
2. Push the interlinking blocks onto the tie rod carefully and
without tilting.
Caution
When interlinking blocks are arranged in series:
Make sure that the electric plug connectors of the inter−
linking blocks are
not bent.
3. Align the CPX terminal on a flat surface so that the compoĆ
nents are not offset. Use the bearing surface for the H−rail
to align the component correctly. It is easier to align if you
use an H−rail. Alternatively, you can place the CPX terĆ
minal without pneumatics or with the CPA pneumatics in
such a way that the interlinking blocks’ electrical connecĆ
tions are facing upwards (see Fig. 2/7). The tie rod is held
in the tie rod groove by the force due to weight.
1
Electrical
connection faces
upwards
2
Tie rod
3
Tie rod groove
1
2
3
Fig. 2/7:
CPX terminal with loosened tie rod interlinking (rear view)
4. Slide the interlinking blocks together carefully and withĆ
out tilting.
5. Place the end plate on the tie rod.