beautypg.com

Festo Контроллер позиционирования CPX-CMPX User Manual

Page 58

background image

2. Assembly

2−14

Festo P.BE−CPX−SYS−EN en 0902e

2. Push the interlinking blocks onto the tie rod carefully and

without tilting.

Caution
When interlinking blocks are arranged in series:
Make sure that the electric plug connectors of the inter−
linking blocks are

not bent.

3. Align the CPX terminal on a flat surface so that the compoĆ

nents are not offset. Use the bearing surface for the H−rail
to align the component correctly. It is easier to align if you
use an H−rail. Alternatively, you can place the CPX terĆ
minal without pneumatics or with the CPA pneumatics in
such a way that the interlinking blocks’ electrical connecĆ
tions are facing upwards (see Fig. 2/7). The tie rod is held
in the tie rod groove by the force due to weight.

1

Electrical
connection faces
upwards

2

Tie rod

3

Tie rod groove

1

2

3

Fig. 2/7:

CPX terminal with loosened tie rod interlinking (rear view)

4. Slide the interlinking blocks together carefully and withĆ

out tilting.

5. Place the end plate on the tie rod.