Festo Контроллер позиционирования CPX-CMPX User Manual
Page 109
4. Commissioning
4−5
Festo P.BE−CPX−SYS−EN en 0902e
Note
Do not connect the cables for the fieldbus when preparing
for commissioning.
In this way, you can avoid:
ć
Addressing errors that may occur due to the modification
of the address range during operation with various
fieldbus systems.
Proceed with preparation as follows:
1. Check the pneumatic tubing of the valve terminals with
the aid of the manual override (see manual for specific
pneumatics).
2. Check the entire electric wiring of the CPX terminal.
3. Check the DIL switch settings of your CPX terminals
(see manual for the specific CPX bus node).