beautypg.com

Removing the rubber feet, Figure 37: rack mounting hole locations – Allied Telesis SwitchBlade x3106 User Manual

Page 85

background image

SwitchBlade x3106 Installation Guide

85

Figure 37. Rack Mounting Hole Locations

5. After installing the two screws in the equipment rack, go to the next

procedure, ”Removing the Rubber Feet”.

Removing the

Rubber Feet

The rubber feet on the bottom of the chassis are for tabletop installation
and should be removed when installing the chassis in an equipment rack.
To remove the rubber feet, perform the following procedure:

Warning
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when lifting the chassis.

Note

Do not remove the shipping brace from the front of the chassis until
after the unit is installed in the equipment rack. You might bend the
chassis and cause misalignment of the slots and card guides if you
lift the chassis without the shipping brace.

1. Place the unit upside down on a level, secure surface, as shown in

Figure 38 on page 86.

6.4 mm (.25 in)

Screw head

Top screw hole of the lowest 1/2” hole pattern

away from rack