beautypg.com

Allied Telesis SwitchBlade x3106 User Manual

Page 107

background image

SwitchBlade x3106 Installation Guide

107

7. Lower the locking handle of the power supply module to secure the

module in the slot, as shown in Figure 63.

Figure 63. Locking the Handle on the AT-SBxPWRPOE1 AC Power

Supply

8. To install a second AT-SBxPWRPOE1 AC Power Supply, repeat this

procedure.

9. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter

5, “Installing the AT-SBx31CFC Card and Ethernet Line Cards” on
page 115
.

Note

Retain the tie wrap that comes with the power supply. You use it to
secure the power cord to the chassis when you power on the unit in
“Powering on the AT-SBxPWRPOE1 AC Power Supply” on
page 164.