Installation tools and material – Allied Telesis SwitchBlade x3106 User Manual
Page 78
Chapter 2: Safety Precautions and Site Preparation
78
Installation Tools and Material
Here is a list of tools and material you need to supply to install the product:
Here are the required items for installing the chassis in an equipment rack:
#2 Phillips-head screwdriver
Six equipment rack screws
Flat-head screwdriver
#2 Phillips-head 10 inch-lbs torque screwdriver (optional)
Here are the required items for installing the grounding wire:
#2 Phillips-head screwdriver
Crimping tool (not provided)
10 AWG stranded grounding wire
#2 Phillips-head 20 inch-lbs torque screwdriver (optional)
Here are the items for installing the AT-SBxPWRSYS1 DC Power Supply:
Two 8 AWG power wires
One 10 AWG stranded grounding wire
8 mm wrench
#1 Phillips-head screwdriver
#3 Phillips-head screwdriver
#3 Phillips-head 30 to 40 inch-lbs torque screwdriver (optional)
Here are the items for installing the AT-SBx31CFC Central Fabric
Controller card and Ethernet line cards:
#2 Phillips-head screwdriver
#2 Phillips-head, 5 inch-lbs torque screwdriver (optional)